{"data":{"id":"us-ca/shc-31234","jurisdiction":"us-ca","citation":"SHC § 31234","heading":"","body":"The collection of tolls shall be continued on the toll tunnel until all bonds issued pursuant to this chapter for its construction are fully redeemed and paid.","path":["Streets and Highways Code - SHC","DIVISION 17. TOLL FACILITIES AND RELATED MATTERS [30000. - 31490.]","CHAPTER 5. El Dorado County Toll Tunnel Authority Act [31100. - 31246.]","ARTICLE 8. Local Cooperation [31230. - 31235.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"daf5bcbb41fed0b022c9cd8a56ae5a22dc96ad195286c2710547145347c209f3","source_id":"us-ca","stale":false,"prev":"us-ca/shc-31233","next":"us-ca/shc-31235"},"notice":"GroundRules: Original legal text. Not legal advice."}
