{"data":{"id":"us-ca/shc-333.1","jurisdiction":"us-ca","citation":"SHC § 333.1","heading":"","body":"Notwithstanding Section 253.3, no portion of the adopted Route 33 freeway between Foster Park and Cozy Dell Canyon Road shall be constructed as a freeway or expressway until a transportation corridor study, on a transportation corridor approximating such portion of the adopted Route 33 freeway, is undertaken and carried to a conclusion by the department in cooperation with the affected local governing agencies, including the County of Ventura and the City of Ojai, and a plan of action for fulfilling the corridor transportation needs has been mutually agreed upon by the parties conducting the study.\nThe transportation corridor study shall, when undertaken, follow a process which includes community involvement and participation in reaching a finding on the transportation needs, and in selection of the optimum means of fulfilling those needs, for the corridor and its related service area.","path":["Streets and Highways Code - SHC","DIVISION 1. STATE HIGHWAYS [50. - 897.]","CHAPTER 2. The State Highway System [230. - 635.]","ARTICLE 3. The State Highway Routes [300. - 635.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"1351814e104a7b8c7667c56b0fa53fb5faf9d1a3e85a7cf425693610e466305a","source_id":"us-ca","stale":false,"prev":"us-ca/shc-333","next":"us-ca/shc-334"},"notice":"GroundRules: Original legal text. Not legal advice."}
