{"data":{"id":"us-ca/shc-5926","jurisdiction":"us-ca","citation":"SHC § 5926","heading":"","body":"A contractor shall not provide a different price for a project financed by a PACE assessment than the contractor would provide if paid in cash by the property owner.","path":["Streets and Highways Code - SHC","DIVISION 7. THE IMPROVEMENT ACT OF 1911 [5000. - 6794.]","PART 3. PERFORMING THE WORK [5100. - 5954.]","CHAPTER 29.1. Clean Energy Assessment Contracts [5900. - 5954.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"5f37da4b57775a5f34ea664a04707267ad3b5d9110b5683eac138612e5058116","source_id":"us-ca","stale":false,"prev":"us-ca/shc-5925","next":"us-ca/shc-5940"},"notice":"GroundRules: Original legal text. Not legal advice."}
