{"data":{"id":"us-ca/shc-6761","jurisdiction":"us-ca","citation":"SHC § 6761","heading":"","body":"The legislative body may by ordinance require increased depth of concrete between to the full depth of or under the ties, or both, if the legislative body in its judgment decides that this method of construction is necessary.","path":["Streets and Highways Code - SHC","DIVISION 7. THE IMPROVEMENT ACT OF 1911 [5000. - 6794.]","PART 6. IMPROVEMENT OF RAILWAY ROADBEDS [6750. - 6794.]","CHAPTER 2. New Improvements [6760. - 6772.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"aa6040203978dbb8badc9ecfabf83b0d572867361a111285c9e86143a4d2678b","source_id":"us-ca","stale":false,"prev":"us-ca/shc-6760","next":"us-ca/shc-6762"},"notice":"GroundRules: Original legal text. Not legal advice."}
