{"data":{"id":"us-ca/wat-11565","jurisdiction":"us-ca","citation":"WAT § 11565","heading":"","body":"The construction of all or any part of the San Joaquin Pumping System may be deferred until such time as the department determines that the construction of it is required and is economically justified.","path":["Water Code - WAT","DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES [10000. - 12999.]","PART 3. CENTRAL VALLEY PROJECT [11100. - 11985.]","CHAPTER 5. Construction of Project by the Department of Water Resources [11550. - 11567.]","ARTICLE 3. Sequence of Units [11565. - 11567.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"071ea088a63eed8b25e8b0475b33a45589f0f52f16b448d406d1dc318dbda8f9","source_id":"us-ca","stale":false,"prev":"us-ca/wat-11560","next":"us-ca/wat-11566"},"notice":"GroundRules: Original legal text. Not legal advice."}