{"data":{"id":"us-ca/wat-11576","jurisdiction":"us-ca","citation":"WAT § 11576","heading":"","body":"The cost of contruction of the project includes the cost and expense of acquiring property and any such cost and expense is an integral part of the capital cost of the project.","path":["Water Code - WAT","DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES [10000. - 12999.]","PART 3. CENTRAL VALLEY PROJECT [11100. - 11985.]","CHAPTER 6. Acquisition and Disposal of Property [11575. - 11595.]","ARTICLE 1. General Provisions [11575. - 11578.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"213665e25a8381dcf0b26713aa004d355b30373c9c54bb8f3389cf64acc6e774","source_id":"us-ca","stale":false,"prev":"us-ca/wat-11575","next":"us-ca/wat-11577"},"notice":"GroundRules: Original legal text. Not legal advice."}
