{"data":{"id":"us-ca/wat-12661","jurisdiction":"us-ca","citation":"WAT § 12661","heading":"","body":"The plan for the Terminus and Success Reservoirs on the Kaweah and Tule Rivers for flood control and other purposes in the San Joaquin Valley is adopted and authorized in accordance with the recommendations of the Chief of Engineers in Flood Control Committee Document Numbered 1, Seventy-eighth Congress, Second Session.","path":["Water Code - WAT","DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES [10000. - 12999.]","PART 6. WATER DEVELOPMENT PROJECTS [12570. - 12949.5.]","CHAPTER 2. Approved Projects [12639. - 12751.]","ARTICLE 2. Projects in the Sacramento-San Joaquin Watersheds [12645. - 12670.23.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"854ab06292fd0ae82fb8320209dddcbfa6eee904ec59130cdd6e888e7af26f6f","source_id":"us-ca","stale":false,"prev":"us-ca/wat-12660","next":"us-ca/wat-12661.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
