{"data":{"id":"us-ca/wat-12953","jurisdiction":"us-ca","citation":"WAT § 12953","heading":"","body":"For the purposes of this part the Department of Water Resources shall designate the site of principal construction of every water construction project undertaken by the State, and the date construction was started.","path":["Water Code - WAT","DIVISION 6. CONSERVATION, DEVELOPMENT, AND UTILIZATION OF STATE WATER RESOURCES [10000. - 12999.]","PART 7. PROJECT COSTS FOR LOCAL GOVERNMENTAL SERVICES [12950. - 12961.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"4ebe8dfe515dd6c0fa5d027f942c6b00c57e4972225bfe619e4e62e5ddb2166d","source_id":"us-ca","stale":false,"prev":"us-ca/wat-12952","next":"us-ca/wat-12954"},"notice":"GroundRules: Original legal text. Not legal advice."}
