{"data":{"id":"us-ca/wat-1395","jurisdiction":"us-ca","citation":"WAT § 1395","heading":"","body":"Actual construction work upon any project shall begin within the time specified in the permit, which time shall not be less than 60 days from the date of the permit.","path":["Water Code - WAT","DIVISION 2. WATER [1000. - 5951.]","PART 2. APPROPRIATION OF WATER [1200. - 1851.]","CHAPTER 6. Permits [1375. - 1410.2.]","ARTICLE 4. Application to Beneficial Use and Construction of Works [1395. - 1398.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"cdceb2bd03dabb68d13853162234b54e877dee6eebc8de49561e4bee02a076fd","source_id":"us-ca","stale":false,"prev":"us-ca/wat-1394","next":"us-ca/wat-1396"},"notice":"GroundRules: Original legal text. Not legal advice."}
