{"data":{"id":"us-ca/wat-42226","jurisdiction":"us-ca","citation":"WAT § 42226","heading":"","body":"In the event of the division of the project into units of construction, and the specification of one or more units for future construction, the board shall, when it determines upon the construction of any unit, pass a resolution to that effect.","path":["Water Code - WAT","DIVISION 14. CALIFORNIA WATER STORAGE DISTRICT LAW [39000. - 48401.]","PART 5. DISTRICT PROJECT [42200. - 42752.]","CHAPTER 1. The Project [42200. - 42297.]","ARTICLE 2. Units of Construction [42225. - 42227.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"f42dedaa6e4e1fe50549044396aacd4a98db41894e34273148adcfb49aae406c","source_id":"us-ca","stale":false,"prev":"us-ca/wat-42225","next":"us-ca/wat-42227"},"notice":"GroundRules: Original legal text. Not legal advice."}
