{"data":{"id":"us-ca/wat-46150","jurisdiction":"us-ca","citation":"WAT § 46150","heading":"","body":"If a district project is adopted as provided in Chapter 3 (commencing with Section 42500) of Part 5 of this division, the board shall appoint three commissioners, one of whom shall be a civil engineer and one shall have a practical knowledge of irrigation.","path":["Water Code - WAT","DIVISION 14. CALIFORNIA WATER STORAGE DISTRICT LAW [39000. - 48401.]","PART 9. ASSESSMENTS [46000. - 47982.]","CHAPTER 2. Original Assessments to Finance Projects [46150. - 46382.]","ARTICLE 1. Commissioners [46150. - 46156.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"e496a8477479bfb7e3bce4290aff8ff0bba478f1ea1fc0b73a396189db695669","source_id":"us-ca","stale":false,"prev":"us-ca/wat-46010","next":"us-ca/wat-46151"},"notice":"GroundRules: Original legal text. Not legal advice."}
