{"data":{"id":"us-ca/wat-46177","jurisdiction":"us-ca","citation":"WAT § 46177","heading":"","body":"If the project includes plans for the generation of electric power, the commissioners shall ascertain the total cost of all the properties which are necessary to be used in connection with the generation of electric power as set forth in the plan, and shall also ascertain what portion of the assessment of benefits to accrue to each tract consists of costs of the properties which are necessary to be so used.","path":["Water Code - WAT","DIVISION 14. CALIFORNIA WATER STORAGE DISTRICT LAW [39000. - 48401.]","PART 9. ASSESSMENTS [46000. - 47982.]","CHAPTER 2. Original Assessments to Finance Projects [46150. - 46382.]","ARTICLE 2. Apportionment of Costs [46175. - 46179.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"06dd29f2771a71dbe9bf9e354457240839568cdf7b48cad3c0290d509fd513d9","source_id":"us-ca","stale":false,"prev":"us-ca/wat-46176","next":"us-ca/wat-46178"},"notice":"GroundRules: Original legal text. Not legal advice."}
