{"data":{"id":"us-ca/wat-75541","jurisdiction":"us-ca","citation":"WAT § 75541","heading":"","body":"Within six months after the date of establishing a zone or zones, all water-producing facilities located within the boundaries of such zone or zones shall be registered with the district and, if required by the board, shall be measured with a water-measuring device satisfactory to the district, which shall be installed by the district or, at the district’s option, by the operator thereof.","path":["Water Code - WAT","DIVISION 21. WATER CONSERVATION DISTRICTS [74000. - 76501.]","PART 9. GROUND WATER CHARGE [75500. - 75642.]","CHAPTER 2. Establishment of Zones and Registration of Water-Measuring Devices [75540. - 75544.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"d8a37c68ce0f1be408ac9387a27eece921fe3cdf125d5eb99bed2a925dabeca4","source_id":"us-ca","stale":false,"prev":"us-ca/wat-75540","next":"us-ca/wat-75542"},"notice":"GroundRules: Original legal text. Not legal advice."}
