{"data":{"id":"us-ca/wat-75542","jurisdiction":"us-ca","citation":"WAT § 75542","heading":"","body":"Any new water-producing facility constructed or reestablished after the period prescribed in Section 75541 shall be registered with the district and, if required by the board, measured with a water-measuring device satisfactory to the district within 30 days after the completion or reestablishment thereof.","path":["Water Code - WAT","DIVISION 21. WATER CONSERVATION DISTRICTS [74000. - 76501.]","PART 9. GROUND WATER CHARGE [75500. - 75642.]","CHAPTER 2. Establishment of Zones and Registration of Water-Measuring Devices [75540. - 75544.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"1760420868719d8eb2587caf5270974a70da7bec6ed5d41f1a86ec75361a1353","source_id":"us-ca","stale":false,"prev":"us-ca/wat-75541","next":"us-ca/wat-75543"},"notice":"GroundRules: Original legal text. Not legal advice."}
