{"data":{"id":"us-ca/wat-79205.14","jurisdiction":"us-ca","citation":"WAT § 79205.14","heading":"","body":"Funds available from the subaccount shall be available for all phases of project development including, but not limited to, project administration, permitting and environmental compliance, feasibility studies, and construction.","path":["Water Code - WAT","DIVISION 26. SAFE DRINKING WATER, CLEAN WATER, WATERSHED PROTECTION, AND FLOOD PROTECTION ACT [79000. - 79222.]","CHAPTER 9. Water Supply, Reliability, and Infrastructure Program [79165. - 79205.16.]","ARTICLE 4. Interim Water Reliable Supply and Water Quality Infrastructure and Management Program [79205.2. - 79205.16.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"e11fa527e1cda77979fd389800942b6a0ab23aeec2e4860d6aa1d44020008bb1","source_id":"us-ca","stale":false,"prev":"us-ca/wat-79205.12","next":"us-ca/wat-79205.16"},"notice":"GroundRules: Original legal text. Not legal advice."}
