{"data":{"id":"us-ca/wat-79758","jurisdiction":"us-ca","citation":"WAT § 79758","heading":"","body":"Surface storage projects funded pursuant to this chapter and described in subdivision (a) of Section 79751 may be made a unit of the Central Valley Project as provided in Section 11290 and may be financed, acquired, constructed, operated, and maintained pursuant to Part 3 (commencing with Section 11100) of Division 6.","path":["Water Code - WAT","DIVISION 26.7. Water Quality, Supply, and Infrastructure Improvement Act of 2014 [79700. - 79798.]","CHAPTER 8. Statewide Water System Operational Improvement and Drought Preparedness [79750. - 79760.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"b8849ec567118673cf5b575686236b627dd8c9b0cbd4d6f358556278f08850b0","source_id":"us-ca","stale":false,"prev":"us-ca/wat-79757","next":"us-ca/wat-79759"},"notice":"GroundRules: Original legal text. Not legal advice."}
