{"data":{"id":"us-ca/wat-8636","jurisdiction":"us-ca","citation":"WAT § 8636","heading":"","body":"Any landowner, reclamation district, drainage district, levee district, municipal corporation or other organization or association authorized by law to construct, repair or complete a levee shall have 30 days after completion of the giving of notice by publication within which to apply to the board for leave to construct, repair or complete the levee.","path":["Water Code - WAT","DIVISION 5. FLOOD CONTROL [8000. - 9651.]","PART 4. THE CENTRAL VALLEY FLOOD PROTECTION BOARD [8520. - 9142.]","CHAPTER 3. Powers, Duties and Jurisdiction [8590. - 8723.]","ARTICLE 3. Levees [8630. - 8647.]"],"source_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip","current_through":"2026-09-13","vintage":"","retrieved_at":"2026-09-14T05:56:33Z","sha256":"9463a020ca80773e17e088423f3ef6e8de507eb499e443caed44e44aa5336c04","source_id":"us-ca","stale":false,"prev":"us-ca/wat-8635","next":"us-ca/wat-8637"},"notice":"GroundRules: Original legal text. Not legal advice."}
