{"data":{"id":"us-co/c.r.s.-30-28-305","jurisdiction":"us-co","citation":"C.R.S. § 30-28-305","heading":"Preparation of subdivision exemption plat.","body":"(1) The board of county commissioners shall have a subdivision exemption plat prepared for those properties in the land division study area for which the owners have:\n\n(a) Not elected to withdraw from the plan as provided in section 30-28-304 (3);\n\n(b) Given written consent to participate in the plan for platting and have supplied adequate evidence of title as required by section 30-28-304 (4).\n\n(2) The exemption plat shall be prepared by a professional land surveyor, and shall assign a lot number to each of the properties included in the exemption plat.","path":["Title 30 - GOVERNMENT - COUNTY","Article 28 - County Planning and Building Codes","Part 3 - ESTABLISHMENT OF SUBDIVISION EXEMPTION PLATS FOR THE PURPOSE OF CORRECTING LEGAL DESCRIPTIONS"],"source_url":"https://olls.info/crs/crs2026-title-30.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"6440e6a94daf6185999e8578d7a280198526fe6d6a4bafe69391fbb3279fb013","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-30-28-304","next":"us-co/c.r.s.-30-28-306"},"notice":"GroundRules: Original legal text. Not legal advice."}
