{"data":{"id":"us-co/c.r.s.-37-24-102","jurisdiction":"us-co","citation":"C.R.S. § 37-24-102","heading":"Contractor - bond - engineer.","body":"The person to whom a contract may be awarded shall execute a bond in the penal sum of not less than ten percent of the contract price, with surety to be approved by the board of directors, payable to the drainage district, conditioned for the faithful performance of the contract. All work shall be done under the direction and to the satisfaction of the engineer employed by the drainage district subject to approval by the board of directors.","path":["Title 37 - WATER AND IRRIGATION","Article 24 - Construction of System"],"source_url":"https://olls.info/crs/crs2026-title-37.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"08b660982adefc0f2ccbdf64336c7adfde264827e2ebc20ad534c1d541fb2099","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-37-24-101","next":"us-co/c.r.s.-37-24-103"},"notice":"GroundRules: Original legal text. Not legal advice."}
