{"data":{"id":"us-co/c.r.s.-37-43-209","jurisdiction":"us-co","citation":"C.R.S. § 37-43-209","heading":"Submission of plans to state engineer - not required.","body":"(1) Notwithstanding the provisions of section 37-41-104 (1), a contracting district shall not be required to submit to the state engineer:\n\n(a) Plans for the construction, operation, or maintenance of salinity control laterals; or\n\n(b) Information concerning such salinity control laterals.\n\n(2) Notwithstanding the provisions of section 37-41-104 (1), a contracting district shall not be required to obtain a decision from the state engineer as to the feasibility of construction, operation, and maintenance of salinity control laterals.","path":["Title 37 - WATER AND IRRIGATION","Article 43 - Irrigation Districts of 1905 and 1921 and Irrigation District Salinity Control Act","Part 2 - IRRIGATION DISTRICT SALINITY CONTROL ACT"],"source_url":"https://olls.info/crs/crs2026-title-37.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"e84b1a55cd2deadba42a2abc3513908cfe91f849987b0995c0263cde599673fd","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-37-43-208","next":"us-co/c.r.s.-37-43-210"},"notice":"GroundRules: Original legal text. Not legal advice."}
