{"data":{"id":"us-co/c.r.s.-37-90-142","jurisdiction":"us-co","citation":"C.R.S. § 37-90-142","heading":"State engineer - action upon permit.","body":"Except as otherwise provided by specific statute, the state engineer shall act upon an application for a well permit within forty-five days of the receipt thereof.","path":["Title 37 - WATER AND IRRIGATION","Article 90 - Underground Water"],"source_url":"https://olls.info/crs/crs2026-title-37.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"f377b351d7b06c504de40eabb876b1d171231004c20543e68612b230c104db27","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-37-90-141","next":"us-co/c.r.s.-37-90-143"},"notice":"GroundRules: Original legal text. Not legal advice."}