{"data":{"id":"us-co/c.r.s.-37-90.5-111","jurisdiction":"us-co","citation":"C.R.S. § 37-90.5-111","heading":"Coordination between the commission and the state engineer.","body":"(1) When an operations permit is issued by the commission pursuant to section 37-90.5-106 (1)(b)(II) and a use permit is issued by the state engineer pursuant to section 37-90.5-107 (1), the commission and the state engineer shall coordinate to:\n\n(a) Ensure that any applicable requirements of the commission and the state engineer are met; and\n\n(b) Determine whether an accounting for the use and reinjection of geothermal fluid or water pursuant to the applicable permit may be submitted to only the commission, only to the state engineer, or to both.","path":["Title 37 - WATER AND IRRIGATION","Article 90.5 - Geothermal Resources"],"source_url":"https://olls.info/crs/crs2026-title-37.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"a9c0de477d7c16a69e0e8156aa16a073e735fa779fa9cfc51eec8a281b62a3ba","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-37-90.5-110","next":"us-co/c.r.s.-37-90.5-112"},"notice":"GroundRules: Original legal text. Not legal advice."}
