{"data":{"id":"us-co/c.r.s.-40-2-139","jurisdiction":"us-co","citation":"C.R.S. § 40-2-139","heading":"Investor-owned utility electric resource planning - maximum discount rate authorized.","body":"If the commission relies on the use of a discount rate when calculating net present value of future carbon-based fuel costs in an electric resource plan, the discount rate must not exceed the long-term rate of inflation, as determined by the commission. In determining the long-term rate of inflation, the commission shall determine an appropriate rate of inflation specifically for fuel costs.","path":["Title 40 - UTILITIES","Article 2 - Public Utilities Commission - Renewable Energy Standard","Part 1 - GENERAL AND ADMINISTRATIVE PROVISIONS"],"source_url":"https://olls.info/crs/crs2026-title-40.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"91fd855f764b94b502cc0b1c1145233bbbe199ba9a23d509a5fe45e355555db1","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-40-2-138","next":"us-co/c.r.s.-40-2-140"},"notice":"GroundRules: Original legal text. Not legal advice."}
