{"data":{"id":"us-co/c.r.s.-40-3.2-101.5","jurisdiction":"us-co","citation":"C.R.S. § 40-3.2-101.5","heading":"Definitions.","body":"As used in this article 3.2, unless the context otherwise requires:\n\n(1) \"Air quality improvement costs\" means the incremental life-cycle costs including capital, operating, maintenance, fuel, and financing costs incurred or to be incurred by a public utility at electric generating facilities located in Colorado. To account for the timing differences between various costs and revenue recovery, life-cycle costs shall be calculated using net present value analysis.","path":["Title 40 - UTILITIES","Article 3.2 - Air Quality Improvement Costs","Part 1 - GENERAL PROVISIONS"],"source_url":"https://olls.info/crs/crs2026-title-40.htm","current_through":"Colorado Revised Statutes 2026","vintage":"","retrieved_at":"2026-09-14T18:37:45Z","sha256":"911b7e5c09ff6c7a40ffec04a02be65187c404d2306988e8ec5c8d545488eea6","source_id":"us-co","stale":false,"prev":"us-co/c.r.s.-40-3.2-101","next":"us-co/c.r.s.-40-3.2-102"},"notice":"GroundRules: Original legal text. Not legal advice."}
