{"data":{"id":"us-ct/conn.-gen.-stat.-13b-31f","jurisdiction":"us-ct","citation":"Conn. Gen. Stat. § 13b-31f","heading":"Ninety-day permit application final determinations.","body":"Notwithstanding any provision of the general statutes, the Department of Transportation shall review and make a final determination on each of the following types of permit applications not later than ninety days after receipt of such application: (1) Encroachment, (2) parkway, (3) industrial truck, (4) outdoor advertising, and (5) specific information signs on limited access highways. Following such ninety-day period, if a final determination on such an application is not made by said agency, such application shall be deemed approved.","path":["TITLE 13b. TRANSPORTATION","CHAPTER 242*. DEPARTMENT OF TRANSPORTATION","PART II. HIGHWAYS"],"source_url":"https://www.cga.ct.gov/current/pub/chap_242.htm#sec_13b-31f","current_through":"Revised to January 1, 2026 (2026 Supplement to the General Statutes of Connecticut, applied over the base revision of January 1, 2025)","vintage":"","retrieved_at":"2026-09-06T19:07:00Z","sha256":"fe5f9d952deb19220f7b425e21e4125ea334510771a9a46a7e9e0fa4e7937b43","source_id":"us-ct","stale":false,"prev":"us-ct/conn.-gen.-stat.-13b-31e","next":"us-ct/conn.-gen.-stat.-13b-31g"},"notice":"GroundRules: Original legal text. Not legal advice."}
