{"data":{"id":"us-ct/conn.-gen.-stat.-22a-196","jurisdiction":"us-ct","citation":"Conn. Gen. Stat. § 22a-196","heading":"Location of asphalt batching or continuous mix facility.","body":"(a) No asphalt batching or continuous mix facility shall be located in an area which is less than one-third of a mile in linear distance from any hospital, nursing home, school, area of critical environmental concern, watercourse, or area occupied by residential housing. Such distance shall be measured from the outermost perimeter of such facility to the outermost point of such zones provided that any such facility in operation as of December 31, 1997, shall not be subject to the provisions of this section.\n(b) Notwithstanding the provisions of subsection (a) of this section, this section shall not apply to any portable asphalt batching plant that does not require a permit from the Department of Energy and Environmental Protection pursuant to the provisions of any regulations adopted under section 22a-174.","path":["TITLE 22a. ENVIRONMENTAL PROTECTION","CHAPTER 446c. AIR POLLUTION CONTROL"],"source_url":"https://www.cga.ct.gov/current/pub/chap_446c.htm#sec_22a-196","current_through":"Revised to January 1, 2026 (2026 Supplement to the General Statutes of Connecticut, applied over the base revision of January 1, 2025)","vintage":"","retrieved_at":"2026-09-06T19:07:07Z","sha256":"bc1448a4a46317f09f77b03508d63c8ff1f3a1813ee411cbecceec6117b218b7","source_id":"us-ct","stale":false,"prev":"us-ct/conn.-gen.-stat.-22a-195","next":"us-ct/conn.-gen.-stat.-22a-197"},"notice":"GroundRules: Original legal text. Not legal advice."}
