{"data":{"id":"us-dc/d.c.-code-34-302","jurisdiction":"us-dc","citation":"D.C. Code § 34-302","heading":"Approval of construction of gas or electric plant.","body":"No person shall begin the construction of a gas plant or an electric plant without first having obtained the permission and approval of the Commission.","path":["Title 34. Public Utilities.","Chapter 3. Gas and Electric Corporations."],"source_url":"https://code.dccouncil.gov/us/dc/council/code/sections/34-302","current_through":"2026-08-20 (D.C. Law 26-175)","vintage":"","retrieved_at":"2026-08-29T05:44:07Z","sha256":"da56fe06cf6d203c2929ae2d0c9c352a4ef7d4831f1b187a1aed1fba452b369d","source_id":"us-dc","stale":false,"prev":"us-dc/d.c.-code-34-301","next":"us-dc/d.c.-code-34-302.01"},"notice":"GroundRules: Original legal text. Not legal advice."}
