{"data":{"id":"us-dc/d.c.-code-8-111.13","jurisdiction":"us-dc","citation":"D.C. Code § 8-111.13","heading":"Rules.","body":"(a)\nWithin 180 days of May 1, 1990, the Mayor shall submit proposed rules on the control of asbestos and materials that contain asbestos to the Council for a 45-day period of review, excluding Saturdays, Sundays, legal holidays, and days of Council recess. If the Council does not approve or disapprove the proposed rules, in whole or in part, by resolution within the 45-day review period, the proposed rules shall be deemed effective. The Mayor shall submit any amendment to the proposed rules to the Council for a 45-day period of review pursuant to this section.\n\n(b)\nThe proposed rules shall include, but not be limited to, the following:\n(1)\nCriteria for the display of caution signs at an asbestos abatement project site;\n(2)\nRequirements for wetting asbestos material;\n(3)\nRequirements for the disposal of asbestos or material that contains asbestos;\n(4)\nRequirements to clean and monitor an asbestos abatement project site where abatement has occurred;\n(5)\nRequirements to enclose and seal materials used in an asbestos abatement project;\n(6)\nAsbestos control procedures for demolition and renovation projects;\n(7)\nAppropriate exemption standards and alternative procedures for removal, including the use of resilient floor covering manufacturers’ recommended work practices for the handling and removal of resilient floor covering materials;\n(8)\nA schedule of license and permit fees;\n(9)\nCriteria for asbestos health and safety training courses;\n(10)\nContinuing education requirements for asbestos workers, supervisory asbestos workers, or contractors that are engaged in asbestos abatement;\n(11)\nReciprocity and endorsement provisions;\n(12)\nProcedures to notify the public that an asbestos abatement project is about to commence;\n(13)\nRequirements for asbestos worker protection, including provisions that require a business entity to:\n(A)\nSubmit to the Mayor a copy of the federally required respiratory protection program;\n(B)\nEnsure that workers complete a training course on asbestos abatement that includes, but is not limited to, recognition of asbestos health hazards to the public, and federal and District asbestos requirements;\n(C)\nCertify to the Mayor that the business entity provides workers with protective clothing and equipment; and\n(14)\nRequirements that provide protection of occupants of a building affected by an asbestos abatement project, including but not limited to, provisions that require:\n(A)\nCertification that the level of asbestos fibers in affected units after an asbestos project is not more than .01 fibers per cubic centimeter;\n(B)\nCertification by the business entity and District inspectors that the techniques used during the asbestos abatement project are safe and that an affected unit is safe for rehabitation; and\n(C)\nProcedures for the notification and education of occupants not less than 30 days prior to the commencement of an asbestos abatement project of the health or safety reasons that necessitate the asbestos abatement project and the procedures, including alternate accommodations and protection of belongings, that will be used to protect the health and safety of occupants of affected units.","path":["Title 8. Environmental and Animal Control and Protection.","Chapter 1. Environmental Controls.","Subchapter VI. Asbestos Licensing and Control."],"source_url":"https://code.dccouncil.gov/us/dc/council/code/sections/8-111.13","current_through":"2026-08-20 (D.C. Law 26-175)","vintage":"","retrieved_at":"2026-08-29T05:44:07Z","sha256":"d1319da1cc4acc3496028ad9160304801b5796a438e228cf5327e890902c873b","source_id":"us-dc","stale":false,"prev":"us-dc/d.c.-code-8-111.12","next":"us-dc/d.c.-code-8-111.14"},"notice":"GroundRules: Original legal text. Not legal advice."}
