{"data":{"id":"us-dc/d.c.-code-9-1174","jurisdiction":"us-dc","citation":"D.C. Code § 9-1174","heading":"Comprehensive assessment.","body":"(a)\nBy January 1, 2014, and by that date every 3 years thereafter, the Mayor shall submit to the Council an assessment on the:\n(1)\nAdvances in propulsion technology;\n(2)\nFeasibility, including cost, of converting to non-aerial motive power where aerial wiring has been installed;\n(3)\nFeasibility, including cost, of using non-aerial motive power on such segments of the streetcar system where construction has yet to be initiated; and\n(4)\nAny recommended amendments to this chapter, including a potential sunset date.\n\n(b)\nThe Council shall hold a public hearing on this report.","path":["Title 9. Transportation Systems.","Chapter 11B. Streetcars 2010."],"source_url":"https://code.dccouncil.gov/us/dc/council/code/sections/9-1174","current_through":"2026-08-20 (D.C. Law 26-175)","vintage":"","retrieved_at":"2026-08-29T05:44:07Z","sha256":"4ec9871b0836e7deabfb2568e6a2565be895fa267be50e781171ea6fbacbb620","source_id":"us-dc","stale":false,"prev":"us-dc/d.c.-code-9-1173","next":"us-dc/d.c.-code-9-1201.01"},"notice":"GroundRules: Original legal text. Not legal advice."}
