{"data":{"id":"us-de/26-del.-c.-910","jurisdiction":"us-de","citation":"26 Del. C. § 910","heading":"Conditional use permit for electrical substations [For application of this section, see 85 Del. Laws, c. 44, § 2].","body":"No county shall deny a conditional use permit to any electrical substation, along with any directly related project infrastructure, proposed to be located on unincorporated land within such county where the following conditions apply:\n(1) The substation is being proposed to support the operation of a proposed renewable energy generation project of 250 MW or greater;\n(2) The proposed substation would be located in a heavy industrial zone;\n(3) An electrical substation is an allowed conditional use within the proposed zone; and\n(4) The specific zoning district in which the proposed substation would be located already has an electric substation located in such zone with a rating of 230kv or greater as of August 3, 2023.","path":["Title 26. Public Utilities","CHAPTER 9. Telegraph, Telephone and Electric Utility Corporations","Subchapter I. General Provisions"],"source_url":"https://delcode.delaware.gov/title26/c009/sc01/index.html#910","current_through":"2026-08-10 (85 Del. Laws, c. 421, 424)","vintage":"","retrieved_at":"2026-09-05T23:02:31Z","sha256":"2d962ba5f154264a8d4dc81f5bd16f0e4afb935efc2abe8d33934b9b88c71570","source_id":"us-de","stale":true,"prev":"us-de/26-del.-c.-909","next":"us-de/26-del.-c.-920"},"notice":"GroundRules: Original legal text. Not legal advice."}