{"data":{"id":"us-ga/o.c.g.a.-12-7-21","jurisdiction":"us-ga","citation":"O.C.G.A. § 12-7-21","heading":"Appointment of panel to study controls implemented pursuant to chapter; procedure and operation of panel.","body":"Reserved.","path":["TITLE 12 Conservation And Natural Resources","CHAPTER 7 Control of Soil Erosion and Sedimentation"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.12.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"f58a0b28a0463cddffa0947e4d1ca977e51673cb65c0dcf8f56cb95f0943e075","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-12-7-20","next":"us-ga/o.c.g.a.-12-7-22"},"notice":"GroundRules: Original legal text. Not legal advice."}
