{"data":{"id":"us-ga/o.c.g.a.-12-8-188","jurisdiction":"us-ga","citation":"O.C.G.A. § 12-8-188","heading":"Biennial needs assessment report on hazardous waste management facility.","body":"The division shall no less than biennially assess capacity, demand, generation, and other factors which may affect the determination of the need for a hazardous waste management facility in Georgia to be built with state support and involvement and shall include in the biennial report required by Code Section 12-8-186 a needs assessment report relative to the need for such a facility and the continued need for the assessment required by this Code section.","path":["TITLE 12 Conservation And Natural Resources","CHAPTER 8 Waste Management","Article 8 Pollution Prevention Assistance Division"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.12.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"77661edbe7b71084eb5b156e13311aa34315feda32fdb70e6f993c35eb69234e","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-12-8-187","next":"us-ga/o.c.g.a.-12-8-189"},"notice":"GroundRules: Original legal text. Not legal advice."}
