{"data":{"id":"us-ga/o.c.g.a.-13-4-3","jurisdiction":"us-ga","citation":"O.C.G.A. § 13-4-3","heading":"Alteration of written contract — Requirement of preliminary proof as to material alteration.","body":"If the contract is not set forth as the basis of the action, so as to require a denial under oath, an alteration in a material part requires explanation before it can be admitted as evidence. This preliminary proof shall be submitted to the court.","path":["TITLE 13 Contracts","CHAPTER 4 Modification, Extinguishment, and Renewal","Article 1 General Provisions"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.13.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"e9d6cc4f3f3636037931e85fb33d99ac8c3c8ad4054d629e25840ed9d7994c3a","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-13-4-2","next":"us-ga/o.c.g.a.-13-4-4"},"notice":"GroundRules: Original legal text. Not legal advice."}
