{"data":{"id":"us-ga/o.c.g.a.-13-6-14","jurisdiction":"us-ga","citation":"O.C.G.A. § 13-6-14","heading":"Number of actions for breach of contract.","body":"If a contract is entire, only one action may be maintained for a breach thereof; but, if it is severable or if the breaches occur at successive periods in an entire contract, an action will lie for each breach; but all the breaches occurring up to the commencement of the action must be included therein.","path":["TITLE 13 Contracts","CHAPTER 6 Damages and Costs Generally"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.13.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"1844f8167aaa0f07bf37b211cdb030da6d4a2f89cd7858a4d087cf9f0c966fae","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-13-6-13","next":"us-ga/o.c.g.a.-13-6-15"},"notice":"GroundRules: Original legal text. Not legal advice."}
