{"data":{"id":"us-ga/o.c.g.a.-22-3-80","jurisdiction":"us-ga","citation":"O.C.G.A. § 22-3-80","heading":"Definitions.","body":"As used in this article, the term:\n(1) “Existing petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.\n(2) “Expansion” shall have the same meaning as set forth in Code Section 12-17-1.\n(3) “Extension” shall have the same meaning as set forth in Code Section 12-17-1.\n(4) “Maintenance” shall have the same meaning as set forth in Code Section 12-17-1.\n(5) “New petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.\n(6) “Parallel petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.\n(7) “Petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.\n(8) “Petroleum pipeline company” shall have the same meaning as set forth in Code Section 12-17-1.","path":["TITLE 22 Eminent Domain","CHAPTER 3 Exercise of Power of Eminent Domain for Special Purposes","Article 4 Construction and Operation of Petroleum Pipelines"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.22.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"f0f7be6d8817a5f3aa461427cd4cf6859215b7530171a25dfc8aa1485b0ee3cb","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-22-3-63","next":"us-ga/o.c.g.a.-22-3-81"},"notice":"GroundRules: Original legal text. Not legal advice."}
