{"data":{"id":"us-ga/o.c.g.a.-31-45-4","jurisdiction":"us-ga","citation":"O.C.G.A. § 31-45-4","heading":"Issuance of permits; terms of expiration.","body":"(a) On or after December 31, 2000, a permit shall be obtained from the county board of health in the county in which a public swimming pool is located prior to construction or continued operation of a public swimming pool. When the ownership of a public swimming pool changes or if the pool is leased by the owner, it shall be the responsibility of the new owner or lessee to secure a permit issued in his or her name.\n(b) Unless suspended or revoked, a swimming pool operation permit shall be valid for the period of operation specified in the application, but in no event shall it be valid for more than 12 months.","path":["TITLE 31 Health","CHAPTER 45 Public Swimming Pools"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.31.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"2b4896f2afbcdc642753f163d435615ec834187bc4c167aed0151279d9c35580","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-31-45-3","next":"us-ga/o.c.g.a.-31-45-5"},"notice":"GroundRules: Original legal text. Not legal advice."}
