{"data":{"id":"us-ga/o.c.g.a.-43-51-12","jurisdiction":"us-ga","citation":"O.C.G.A. § 43-51-12","heading":"Permit conditions.","body":"The director is authorized where appropriate to include, as a condition in a permit issued pursuant to Part 5 of Article 3 of Chapter 5 of Title 12, the “Georgia Safe Drinking Water Act of 1977,” or Article 2 of Chapter 5 of Title 12, the “Georgia Water Quality Control Act,” a requirement that the operator and laboratory analyst be duly certified in accordance with this chapter.","path":["TITLE 43 Professions And Businesses","CHAPTER 51 Water and Wastewater Treatment Plant Operators and Laboratory Analysts"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.43.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"c013798c8bab78e06322bd485bbf11596bb1dba965e1bd12ad5df5b8a6839d8c","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-43-51-11","next":"us-ga/o.c.g.a.-43-51-13"},"notice":"GroundRules: Original legal text. Not legal advice."}
