{"data":{"id":"us-ga/o.c.g.a.-46-5-41","jurisdiction":"us-ga","citation":"O.C.G.A. § 46-5-41","heading":"Obtaining of certificate of public convenience and necessity for construction, operation, acquisition, or extension of telephone lines, plants, or systems.","body":"No person shall construct or operate any telephone line, plant, or system or any extension thereof or acquire ownership or control thereof, either directly or indirectly, without first obtaining from the Public Service Commission a certificate that the present or future public convenience and necessity require or will require such construction, operation, or acquisition.","path":["TITLE 46 Public Utilities and Public Transportation","CHAPTER 5 Telephone Service","Article 2 Telephone Service","PART 2 Construction and Operation of Lines, Plants, or Systems Generally"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.46.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"0986612501e8953b17f3a48cabae227ee12298e5b000dcbd512235a42784041b","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-46-5-40","next":"us-ga/o.c.g.a.-46-5-42"},"notice":"GroundRules: Original legal text. Not legal advice."}
