{"data":{"id":"us-ga/o.c.g.a.-8-2-164","jurisdiction":"us-ga","citation":"O.C.G.A. § 8-2-164","heading":"License required; permit purchase.","body":"During such time as the Commissioner has contracted or entered into cooperative agreements pursuant to his or her authority under Code Section 8-2-160.1:\n(1) Any installer performing any installation of a manufactured home or a mobile home in this state shall first obtain a license from the Commissioner; provided, however, that persons employed by or contracting with a licensed installer to perform installations shall not be required to obtain such license; and\n(2) In addition to the requirements of paragraph (1) of this Code section, any installer performing any installation of any new or pre-owned manufactured or mobile home in this state shall first purchase a permit from the Commissioner. The cost of such permit shall be $60.00 for each manufactured or mobile home. Each installer shall provide any information required by the Commissioner to be submitted to obtain a permit. A permit shall be attached by the installer to the panel box of each manufactured or mobile home upon completion of installation.","path":["TITLE 8 Buildings and Housing","CHAPTER 2 Standards and Requirements for Construction, and Alteration, of Buildings and Other Structures","Article 2 Factory Built Buildings and Dwelling Units","PART 3 Installation of Manufactured Homes and Mobile Homes"],"source_url":"https://archive.org/download/gov.ga.ocga.2018/release86.2022.11/gov.ga.ocga.title.08.odt","current_through":"Release 86 (2022-11)","vintage":"Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17","retrieved_at":"2026-09-17T19:34:57Z","sha256":"216236b9e6e6501c868233182ea101dad8721310acc0b9412c38577040aa9a73","source_id":"us-ga","stale":false,"prev":"us-ga/o.c.g.a.-8-2-163","next":"us-ga/o.c.g.a.-8-2-165"},"notice":"GroundRules: Original legal text. Not legal advice."}
