{"data":{"id":"us-gu/10-gca-51a910","jurisdiction":"us-gu","citation":"10 GCA § 51A910","heading":"Responsibility for Construction, Operation and Maintenance of the Solid Waste Facility.","body":"The lease-back may require that the contractor be responsible for all costs, expenses and fees of any kind or nature, associated with the improvements, on-site infrastructure, construction, permits and financing associated with the completion of a solid waste facility, except as expressly provided by the lease-back for costs, expenses and fees previously incurred by the government. The lease-back may require that the contractor be responsible for the ongoing operation and maintenance of the solid waste facility during the term of the lease-back.","path":["Title 10: Health and Safety","Division 2 - Environmental Health","Chapter 51A: Guam Solid Waste Authority","ARTICLE 9: SOLID WASTE MANAGEMENT SYSTEM LEASE FINANCING"],"source_url":"https://col.guamcourts.gov/sites/default/files/10gc051A.pdf","current_through":"P.L. 38-133 (June 4, 2026)","vintage":"","retrieved_at":"2026-09-27T03:01:28Z","sha256":"70f577bc8fb0bf66cba7ace6e848598adcfa7fe4e66dfdfd17bca3d69ccb539f","source_id":"us-gu","stale":false,"prev":"us-gu/10-gca-51a909","next":"us-gu/10-gca-51a911"},"notice":"GroundRules: Original legal text. Not legal advice."}
