{"data":{"id":"us-gu/12-gca-8105","jurisdiction":"us-gu","citation":"12 GCA § 8105","heading":"Power, Duty to Connect.","body":"Notwithstanding any other provision of the Guam Code Annotated or any duly promulgated rule or regulation except those service rules and regulations of the Authority, the Authority shall not refuse to connect electrical power to any single family residence because said residence fails to meet specified public health or waste water standards.","path":["Title 12: Autonomous Agencies","Division 1 - Autonomous Agencies","Chapter 8: Guam Power Authority","ARTICLE 1: GENERAL PROVISIONS"],"source_url":"https://col.guamcourts.gov/sites/default/files/12gc008.pdf","current_through":"P.L. 38-133 (June 4, 2026)","vintage":"","retrieved_at":"2026-09-27T03:22:38Z","sha256":"3b792fcdaa6742e5dc864eb2b99359a9fccbd8d6e5e57a114225f5c2a41c0386","source_id":"us-gu","stale":false,"prev":"us-gu/12-gca-8104","next":"us-gu/12-gca-8105.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
