{"data":{"id":"us-gu/12-gca-8506","jurisdiction":"us-gu","citation":"12 GCA § 8506","heading":"Interim Meeting.","body":"GPA is authorized to immediately implement an interim, emergency net metering rate structure wherein Customer generators shall be entitled to receive immediate credit for one hundred percent (100%) of the power generation capacity based on the specifications of the generation equipment installed times the rate the Guam Power Authority currently charges the customer until such time that GPA submits a rate structure to the PUC for the net metering program and it is approved by the PUC. This interim rate shall be subject to PUC revocation at any time.","path":["Title 12: Autonomous Agencies","Division 1 - Autonomous Agencies","Chapter 8: Guam Power Authority","ARTICLE 5: NET METERING"],"source_url":"https://col.guamcourts.gov/sites/default/files/12gc008.pdf","current_through":"P.L. 38-133 (June 4, 2026)","vintage":"","retrieved_at":"2026-09-27T03:22:38Z","sha256":"3b138df43c740d5938bc09b5b3a6527cb82dbad4f8e476a8a779602800a34ee7","source_id":"us-gu","stale":false,"prev":"us-gu/12-gca-8505","next":"us-gu/12-gca-8601"},"notice":"GroundRules: Original legal text. Not legal advice."}
