{"data":{"id":"us-gu/5-gca-58109","jurisdiction":"us-gu","citation":"5 GCA § 58109","heading":"Utilities and Routine Maintenance and Repair.","body":"The Education Agency shall be responsible for the connection and payment of all utilities, including, without limitation, power, water, sewer, telephone and cable of the Education Facility. Capital maintenance and repair shall be performed by the Contractor as provided for in 5 GCA § 58110. Routine maintenance, repair and upkeep shall be the responsibility of the Education Agency and/or the Contractor, as provided by the terms of the Contract.","path":["Title 5: Government Operations","Division 5 - Public Works","Chapter 58: The Education Facilities Construction Initiative Act of 2001"],"source_url":"https://col.guamcourts.gov/sites/default/files/5gc058.pdf","current_through":"P.L. 38-133 (June 4, 2026)","vintage":"","retrieved_at":"2026-09-27T02:23:58Z","sha256":"f651ced9564e6db032904ad98d66f75f6ec71efe9603fd86ae91a09a68ecc96a","source_id":"us-gu","stale":false,"prev":"us-gu/5-gca-58108","next":"us-gu/5-gca-58110"},"notice":"GroundRules: Original legal text. Not legal advice."}
