{"data":{"id":"us-gu/5-gca-59109","jurisdiction":"us-gu","citation":"5 GCA § 59109","heading":"Contractor Responsible for Capital Maintenance.","body":"The Contract with the Contractor, and the Lease-Back, shall provide that all capital maintenance and repair of the Public Safety Facility be performed by the Contractor as a separate cost. The Contractor shall be responsible, during the Lease-Back period, for the timely filing of any applicable insurance claims and for the payment of any deductible required to repair a Public Safety Facility covered by an insurance policy on the Public Safety Facility. The terms by which the Contractor is to perform such Capital Maintenance shall be determined as a part of the bid process and shall be part of the conditions of the Contract.","path":["Title 5: Government Operations","Division 5 - Public Works","Chapter 59: The Public Safety Facilities Construction Initiative Act of 2005"],"source_url":"https://col.guamcourts.gov/sites/default/files/5gc059.pdf","current_through":"P.L. 38-133 (June 4, 2026)","vintage":"","retrieved_at":"2026-09-27T02:24:58Z","sha256":"a89a205bf2a03d077fe5802573d3fa3dabaeed8b834afef10d500ed799b36ecc","source_id":"us-gu","stale":false,"prev":"us-gu/5-gca-59108","next":"us-gu/5-gca-59110"},"notice":"GroundRules: Original legal text. Not legal advice."}
