{"data":{"id":"us-hi/haw.-rev.-stat.-174c-85","jurisdiction":"us-hi","citation":"Haw. Rev. Stat. § 174C-85","heading":"Well completion report.","body":"Within thirty days after the completion of the well, the well driller and pump installation contractor shall file with the commission a written report containing such information prescribed by the commission, including, as appropriate: the depth, thickness, and character of the different strata penetrated and the location of water-bearing strata; the date of completion of the well; the length, size, and weight of the casing and a description of the placement of the casing; the size of the drilled hole; where the well is sealed off; the type of seal; the number of cubic feet per second or gallons per minute of flow from the well; the pressure in pounds per square inch, if a flowing well, and the static water level and water temperature, if a nonflowing well; and a chemical analysis of a water sample drawn from the well.","path":["HI Code","Division 1","Title 12","Chapter 174C"],"source_url":"http://www.capitol.hawaii.gov/hrscurrent/Vol03_Ch0121-0200D/HRS0174C/HRS_0174C-0085.htm","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:11Z","sha256":"4b6e2abb028362208288b14f0520b0ac59a082f08ad53adcec68ac61c4e78fe5","source_id":"us-hi","stale":false,"prev":"us-hi/haw.-rev.-stat.-174c-84","next":"us-hi/haw.-rev.-stat.-174c-86"},"notice":"GroundRules: Original legal text. Not legal advice."}
