{"data":{"id":"us-hi/haw.-rev.-stat.-269-27.5","jurisdiction":"us-hi","citation":"Haw. Rev. Stat. § 269-27.5","heading":"Construction of high-voltage electric transmission lines; hearing.","body":"Whenever a public utility plans to place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system above the surface of the ground through any residential area, the public utilities commission shall conduct a public hearing prior to its issuance of approval thereof. Notice of the hearing shall be given in the manner provided in section 269-16 for notice of public hearings.","path":["HI Code","Division 1","Title 15","Chapter 269"],"source_url":"http://www.capitol.hawaii.gov/hrscurrent/Vol05_Ch0261-0319/HRS0269/HRS_0269-0027_0005.htm","current_through":"2026-08-14","vintage":"open-us-law v2026.08, retrieved 2026-09-14","retrieved_at":"2026-09-14T18:32:11Z","sha256":"24216a63608cf017ff4b242329d6b91d038ffd083d7dfc1cfeb565981bef5ea7","source_id":"us-hi","stale":false,"prev":"us-hi/haw.-rev.-stat.-269-27.4","next":"us-hi/haw.-rev.-stat.-269-27.6"},"notice":"GroundRules: Original legal text. Not legal advice."}
