{"data":{"id":"us-ia/iowa-code-309.81","jurisdiction":"us-ia","citation":"Iowa Code § 309.81","heading":"Record of plans.","body":"Before beginning the construction of a permanent bridge or culvert by day labor or by contract, the county engineer shall file the plans, specifications, estimate of drainage area, estimates of costs, and specific designation of the location of the bridge or culvert in the county engineer’s office.","path":["Title VIII - TRANSPORTATION (Ch. 306 - 330B)","Chapter 309 - SECONDARY ROADS","Subchapter V - MISCELLANEOUS PROVISIONS"],"source_url":"https://www.legis.iowa.gov/docs/code/2026/309.81.pdf","current_through":"Iowa Code 2026 edition","vintage":"","retrieved_at":"2026-09-14T19:40:08Z","sha256":"dbff2f9860c4302577abfe49dd721aff68a4d821f39ac244c92a63b820579e53","source_id":"us-ia","stale":false,"prev":"us-ia/iowa-code-309.80","next":"us-ia/iowa-code-309.82"},"notice":"GroundRules: Original legal text. Not legal advice."}
