{"data":{"id":"us-ia/iowa-code-476a.10","jurisdiction":"us-ia","citation":"Iowa Code § 476A.10","heading":"Costs of proceeding.","body":"The applicant for a certificate, or an amendment to a certificate, shall pay all the costs and expenses incurred by the commission in reaching a decision on the application including the costs of examinations of the site, the hearing, publishing of notice, commission staff salaries, the cost of consultants employed by the commission, and other expenses reasonably attributable to the proceeding.","path":["Title XI - NATURAL RESOURCES (Ch. 455 - 485)","Chapter 476A - ELECTRIC POWER GENERATION AND TRANSMISSION","Subchapter I - ELECTRIC POWER GENERATING FACILITIES"],"source_url":"https://www.legis.iowa.gov/docs/code/2026/476A.10.pdf","current_through":"Iowa Code 2026 edition","vintage":"","retrieved_at":"2026-09-14T19:40:12Z","sha256":"cbaecad34f4450b8dc37b11fa169849e149003c3a0d3a360cae067930d804fae","source_id":"us-ia","stale":false,"prev":"us-ia/iowa-code-476a.9","next":"us-ia/iowa-code-476a.11"},"notice":"GroundRules: Original legal text. Not legal advice."}
