{"data":{"id":"us-ia/iowa-code-479.42","jurisdiction":"us-ia","citation":"Iowa Code § 479.42","heading":"Subsequent pipelines.","body":"1. A pipeline company shall not install a subsequent pipeline upon its existing easement when a damage claim from the installation of its previous pipeline on that easement has not been resolved, unless the damage claim is under litigation, arbitration, or a proceeding pursuant to section 479.46.\n2. With the exception of claims for damage to drain tile and future crop deficiency, for this section to apply, landowners and tenants must submit in writing their claims for damages caused by installation of the pipeline within one year of final cleanup on the real property.","path":["Title XI - NATURAL RESOURCES (Ch. 455 - 485)","Chapter 479 - PIPELINES AND UNDERGROUND GAS STORAGE"],"source_url":"https://www.legis.iowa.gov/docs/code/2026/479.42.pdf","current_through":"Iowa Code 2026 edition","vintage":"","retrieved_at":"2026-09-14T19:40:12Z","sha256":"5dea39704f5b5b5061977b6d0d2ef45001b12834e204ca2f2737e01806410fb6","source_id":"us-ia","stale":false,"prev":"us-ia/iowa-code-479.41","next":"us-ia/iowa-code-479.43"},"notice":"GroundRules: Original legal text. Not legal advice."}
