{"data":{"id":"us-ia/iowa-code-572.11","jurisdiction":"us-ia","citation":"Iowa Code § 572.11","heading":"Extent of lien posted after ninety days.","body":"Liens perfected under section 572.10 shall be enforced against the property or upon the bond, if given, by the owner or by the owner-builder’s buyer, only to the extent of the balance due from the owner to the general contractor or from the owner-builder’s buyer to the owner-builder at the time of the service of such notice; but if the bond was given by the general contractor or owner-builder, or person contracting with the subcontractor posting the claim for a lien, such bond shall be enforced to the full extent of the amount found due the subcontractor.","path":["Title XIV - PROPERTY (Ch. 555 - 594A)","Chapter 572 - MECHANIC’S LIEN"],"source_url":"https://www.legis.iowa.gov/docs/code/2026/572.11.pdf","current_through":"Iowa Code 2026 edition","vintage":"","retrieved_at":"2026-09-14T19:40:15Z","sha256":"daa4f5b02acb0da4300e51a1c74b829634fd782bacab07045be123f2da3b617f","source_id":"us-ia","stale":false,"prev":"us-ia/iowa-code-572.10","next":"us-ia/iowa-code-572.12"},"notice":"GroundRules: Original legal text. Not legal advice."}
